Due to high safety inventory targets and inaccurate forecasts, MRO inventory is usually much higher than necessary. Using advanced analysis, you can view actual usage data and run iterative simulations to generate more accurate predictions. The solution compares the current inventory level with the required demand and service level, and the analysis tool can determine the best inventory level and location. This reduces inventory by up to 40% and accompanying costs by 10%. The tool also enables performance visualization on real-time dashboards, allowing procurement supervisors to track results at any time.
Pipeline roots, floor drains and drainage ditches should be carefully cleaned. If oil and rust are found, steel wire brushes, sandpaper and organic solvents should be used to clean them thoroughly. Our polyurethane foam insulation pipe is closely bonded to the outer skin of the steel pipe because the polyurethane rigid foam insulation layer is closely bonded to the outer skin of the steel pipe, isolating the infiltration of air and water. The company can send personnel to the project site to carry out the heat preservation work of the joint, including the installation of the outer casing of the joint, the connection and sealing of the outer casing of the joint with the supervisor and the foaming of the on-site joint, but does not include the welding of the steel pipe of the joint. Sleeve joint, in this way.
Nanchong high-quality FRP winding directly buried thermal insulation pipe manufacturers recommend prefabricated directly buried insulation pipe patching method should pay attention to: 1, the construction should avoid groundwater and Rain Water immersion, if the end inadvertently immersed, should do drying treatment before connecting the jacket. 2. The pipe should be stored in a flat site, neatly placed, and the height of the pipe should be less than m. 3. Pipe hoisting is light and light, collision and throwing are prohibited, and straight hoisting of steel wire rope is prohibited. 4. The thermal insulation layer and anti-corrosion coating should avoid direct contact with flame. For on-site installation, please follow the following procedures: pipe trench excavation-base treatment (drainage, sand cushion)-lower pipe-steel pipe welding-inspection (water pressure)-installation (pressure test)-foaming-sealing foam cell. Joint installation, the heat preservation work of the joint is carried out on the project site, including the installation of the joint outer casing, the connection and sealing of the joint outer casing with the supervisor and the foaming work of the on-site joint, but does not include the welding of the joint part of the steel pipe.
Polyurethane directly buried insulation pipe for heating in Nangong district is welcome to inquire. The company can send personnel to the project site to carry out the heat preservation work of the joint, including the installation of the outer casing of the joint, the connection and sealing of the outer casing of the joint with the supervisor, and the foaming of the on-site joint, but it does not include the welding of the steel pipe of the joint. ? (1) way? Sleeve joint, in this way, the joint casing adopts polyethylene casing with the same material and density as the prefabricated thermal insulation pipe casing, and the heat shrinkage belt is used to connect and seal between the polyethylene joint casing and the main pipe to ensure the watertightness of the joint. Then the joint foaming is carried out on the foaming hole on the joint casing, and after the foaming is completed, the foaming hole is sealed by patch or hot melt welding.
Improve the quality system of pipeline thermal insulation construction. Air-conditioning water system is standard in hospital buildings. With the increase of building use time, there are more and more problems in air-conditioning water system engineering, in which thermal insulation technology has become the focus. In order to better ensure the construction quality of air conditioning water system engineering, supervision and management must be strengthened in the process of construction. At the same time, the construction side shall arrange professional and technical personnel to organize a professional construction team to carry out construction. In the process of thermal insulation construction, the supervision department is fully responsible for quality management, and supervisors should skillfully master a number of key technical indicators to ensure the effectiveness of supervision work. The supervision unit shall supervise the whole construction process of the air conditioning water system and find and deal with the quality problems existing in the construction process in time. In the process of construction, the hospital arranges full-time personnel for comprehensive supervision, and puts forward suggestions for rectification and improvement in view of the problems in the construction process.
4. The thermal insulation layer and anti-corrosion coating should avoid direct contact with flame. For on-site installation, please follow the following procedures: pipe trench excavation-base treatment (drainage, sand cushion)-lower pipe-steel pipe welding-inspection (water pressure)-installation (pressure test)-foaming-sealing foam cell. Elbow and joint installation can send personnel to the project site to carry out the heat preservation work of the joint, including the installation of the outer casing of the joint, the connection and sealing of the outer casing of the joint with the supervisor, and the foaming work of the on-site joint, but it does not include the welding of the steel pipe of the joint. Construction attention Editing
Zhanjiang external sliding steel sleeve steel steam insulation pipe technology is to win all-through pipeline for you to analyze the prefabricated directly buried insulation pipe repair method should pay attention to: 1, the construction should avoid the immersion of groundwater and Rain Water, if the end is inadvertently immersed in water, it should be dried before connecting the jacket. 2. The pipe should be stored in a flat site, neatly placed, and the height of the pipe should be less than m. 3. Pipe hoisting is light and light, collision and throwing are prohibited, and straight hoisting of steel wire rope is prohibited. 4. The thermal insulation layer and anti-corrosion coating should avoid direct contact with flame. For on-site installation, please follow the following procedures: pipe trench excavation-base treatment (drainage, sand cushion)-lower pipe-steel pipe welding-inspection (water pressure)-installation (pressure test)-foaming-sealing foam cell. Joint installation, the heat preservation work of the joint is carried out on the project site, including the installation of the joint outer casing, the connection and sealing of the joint outer casing with the supervisor and the foaming work of the on-site joint, but does not include the welding of the joint part of the steel pipe.
Our factory can send personnel to the project site to carry out the heat preservation work of the joint, including the installation of the outer casing of the joint, the connection and sealing of the outer casing of the joint with the supervisor and the foaming work of the joint on site, but it does not include the welding of the steel pipe of the joint.
Generally speaking, the horizontal sunshade with an outdoor south elevation of 45 °can easily cover 68% of the solar radiation heat. Installed in the window inside the curtain, soft 100 pages and other sunshade facilities, most of the solar radiation heat absorbed by it is distributed to the indoor air. The sun visor installed on the outside absorbs most of the radiant heat and distributes most of the outdoor air, thus reducing the impact on indoor temperature. Therefore, the use of external sunshade (sunshade) is the best way to save energy in buildings.
Method 1, conduct a survey of the team of the outsourcing service company, chat with the customer service and customer service supervisor, ask about the complexity of the business, the content of the work, and achieve the actual indicators to see if these contents are different from the introduction of the company.